Since we bought the Triton I've been steadily working on putting in the things we needed (I wanted) in it
Firstly I built the drawer system
then I fitted a 90ah battery, merit plug and cigarette lighter plug
A few days ago I got the volt meter in the mail and added that and an Anderson plug
our fridge (70lt Evakool) fits on top of the drawer the black slide you can see to the left of the picture keeps it in line
Under the "box" is also fitted my sand flag and 9db gain UHF antenna, a folding bow saw as well as a shovel, jump pack and jumper leads
Ready for action
I've finished setting up the Triton
- Frank & Brenda
- Posts: 5066
- Joined: Fri Nov 09, 2007 6:26 am
- Location: Aldinga Beach SA (in the Fleurieu peninsula)12 Mistubishi Triton, 1996 J-co DISCOVERY 18' poptop
I've finished setting up the Triton
You do not have the required permissions to view the files attached to this post.
Catch you......Out there
Frank and Brenda
BLOGS
http://www.adelaidetoperthviadarwin.blogspot.com
http://www.tassietour.blogspot.com
http://thewesternadventure.blogspot.com/
Also member of Travellers chat
Frank and Brenda
BLOGS
http://www.adelaidetoperthviadarwin.blogspot.com
http://www.tassietour.blogspot.com
http://thewesternadventure.blogspot.com/
Also member of Travellers chat
- dieseltojo
- Posts: 5190
- Joined: Wed Jun 24, 2009 5:06 pm
- Location: Doveton vic
Re: I've finished setting up the Triton
What a great job, Hard work pays off.
I now have to note that I cannot accept owners ship, truth, quality, or veracity, of articles I may quote off the internet.
1929 Pop Top
Paul & Trudy. Plumber & Plumberess
1929 Pop Top
Paul & Trudy. Plumber & Plumberess